Files
krow_backend/docs
Suriya 939598a187
Some checks failed
CI / test (push) Failing after 4m38s
CI / fixture (push) Failing after 10s
Add the deploy runbook for db4803c and the Gemini switch
Image first, config second -- the old binary on Gemini config fails
every tool-using run on its second model call, and the runbook says
why, what was verified, and how to roll back either half.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PJvibeSc1JYXjatankqM1g
2026-09-22 13:16:46 +05:30
..
2026-08-25 16:37:05 +05:30
2026-08-28 12:21:44 +05:30