feat: add comprehensive release process documentation and version file references

- Introduced RELEASE_VISUAL_GUIDE.md for a visual overview of the release pipeline, including development, staging, and production phases.
- Created RELEASE_WORKFLOW.md detailing step-by-step release procedures for single and multi-product releases, including hotfix processes.
- Added VERSION_FILES_REFERENCE.md to outline all necessary version file updates for each product during releases, ensuring consistency and completeness.
This commit is contained in:
Achintha Isuru
2026-03-05 10:49:09 -05:00
parent faae6c07d5
commit 085445e730
13 changed files with 4650 additions and 2 deletions

View File

@@ -0,0 +1,343 @@
# Hotfix Process
**For Emergency Production Fixes**
---
## 🚨 When to Hotfix
Use hotfix when:
- ✅ Critical bug in production affecting users
- ✅ Data loss or security vulnerability
- ✅ Service unavailable or major feature broken
- ✅ Customer-blocking issue
**Don't use hotfix for:**
- ❌ Minor bugs (can wait for next release)
- ❌ Feature requests
- ❌ Nice-to-have improvements
- ❌ Styling issues
---
## 🔄 Hotfix Process
### Step 1: Assess & Declare Emergency
```
Issue: [Brief description]
Severity: CRITICAL / HIGH / MEDIUM
Product: [Staff Mobile / Client Mobile / Web / Backend]
Environment: Production
Impact: [How many users affected]
```
Once severity confirmed → Start hotfix immediately.
---
### Step 2: Create Hotfix Branch
```bash
# From production tag
git checkout -b hotfix/krow-withus-worker-mobile-v0.1.1 \
krow-withus-worker-mobile/prod-v0.1.0
# Verify you're on the right tag
git log -1 --oneline
```
**Format**: `hotfix/<product>-v<PATCH+1>`
---
### Step 3: Fix the Bug
```bash
# Make your fix
# Edit files, test locally
# Commit with clear message
git commit -m "fix: [issue description]
HOTFIX for production
Issue: [what happened]
Solution: [what was fixed]
Tested: [how was it tested locally]"
```
**Keep it minimal:**
- Only fix the specific bug
- Don't refactor or optimize
- Don't add new features
---
### Step 4: Update Version
Update PATCH version only (0.1.0 → 0.1.1):
**For Mobile** (`apps/mobile/apps/*/pubspec.yaml`):
```yaml
# Old
version: 0.1.0+5
# New
version: 0.1.1+6 # Only PATCH changed
```
**For Web** (`apps/web/package.json`):
```json
"version": "0.1.1"
```
**For Backend** (`backend/*/package.json`):
```json
"version": "0.1.1"
```
---
### Step 5: Update CHANGELOG
Add entry to **top** of appropriate CHANGELOG:
```markdown
| 2026-03-05 | 0.1.1 | HOTFIX: [Issue fixed] |
(previous entries below...)
```
---
### Step 6: Code Review (Expedited)
```bash
# Push hotfix branch
git push origin hotfix/krow-withus-worker-mobile-v0.1.1
# Create PR on GitHub with URGENT label
gh pr create --title "HOTFIX: [Issue description]" \
--body "**URGENT PRODUCTION FIX**
Issue: [What was broken]
Impact: [Users affected]
Solution: [What was fixed]
Testing: [Local verification]"
```
**Get approval within 15 minutes if possible.**
---
### Step 7: Merge to Main
```bash
# Review complete - merge
git checkout main
git pull origin main
git merge --ff-only hotfix/krow-withus-worker-mobile-v0.1.1
git push origin main
```
---
### Step 8: Create Production Tag
```bash
# Create tag from main
git tag -a krow-withus-worker-mobile/prod-v0.1.1 \
-m "HOTFIX: [Issue fixed]"
git push origin krow-withus-worker-mobile/prod-v0.1.1
```
---
### Step 9: Deploy to Production
```bash
# Follow your deployment procedure
# Higher priority than normal releases
./scripts/deploy-mobile-production.sh krow-withus-worker-mobile/prod-v0.1.1
```
**Deployment time**: Within 30 minutes of approval
---
### Step 10: Verify & Monitor
```bash
# Smoke tests
- App launches
- Core features work
- No new errors
# Monitor for 2 hours
- Watch error logs
- Check user reports
- Verify fix worked
```
---
### Step 11: Communicate
**Immediately after deployment:**
```markdown
🚨 PRODUCTION HOTFIX DEPLOYED
Product: Worker Mobile
Version: 0.1.1
Issue: [Fixed issue]
Impact: [Resolved for X users]
Status: ✅ Deployed & verified
No user action required.
Service restored to normal.
```
**24 hours later:**
```markdown
✅ HOTFIX STATUS UPDATE
Production hotfix v0.1.1 deployed 24 hours ago.
Zero errors reported post-deployment.
System stable.
Thank you for your patience!
```
---
## ⏱️ Timeline
```
T-0: Issue detected & reported
T+5min: Severity assessed, hotfix branch created
T+15: Fix implemented, code review started
T+30: Approved & merged, tag created
T+45: Deployed to production
T+60: Smoke tests pass, monitoring enabled
T+120: Declare emergency resolved, communicate
T+1day: Follow-up communication
```
**Total time: 2-4 hours from detection to resolution**
---
## 🚫 Common Mistakes to Avoid
**Don't**:
- Skip code review (even in emergency)
- Add multiple unrelated fixes in one hotfix
- Forget to update version number
- Forget CHANGELOG entry
- Deploy without testing
- Forget to communicate with users
**Do**:
- Keep hotfix minimal and focused
- Test every fix locally first
- Get at least one approval
- Update all version files
- Deploy immediately after approval
- Monitor actively for 2+ hours
---
## 📋 Hotfix Checklist
Copy for each emergency:
```
Hotfix: [Product] v[Old Version] → v[New Version]
□ Severity assessed & documented
□ Branch created from production tag
□ Bug fixed & tested locally
□ Version number updated (PATCH only)
□ CHANGELOG entry added
□ Commit message clear
□ Code review requested (marked URGENT)
□ Approval obtained
□ Merged to main
□ Production tag created
□ Tag pushed to remote
□ Deployed to production
□ Smoke tests passed
□ Error logs monitored (2+ hours)
□ Users notified
□ GitHub Release created
□ Incident documented
Total Time: ___ minutes
```
---
## 🔍 Post-Incident
After emergency is resolved:
1. **Document what happened**
- Root cause analysis
- Why it wasn't caught before
- What testing was missed
2. **Schedule postmortem** (within 24 hours)
- Review what went wrong
- Discuss prevention
- Update processes if needed
3. **Plan prevention**
- Add test coverage
- Update CI/CD checks
- Improve monitoring
4. **Communicate findings**
- Share with team
- Update documentation
- Prevent recurrence
---
## 📞 Emergency Contacts
When issue detected:
1. **Notify**:
- Release Engineer
- DevOps
- Product Owner
- Affected Team
2. **Communication Channel**:
- Slack: #emergency-releases
- Time-sensitive decisions on call
3. **Decision Maker**:
- Product Owner approves rollback vs hotfix
- Release Engineer executes
- DevOps monitors infrastructure
---
## 🔗 Related
- [OVERALL_RELEASE_PLAN.md](./OVERALL_RELEASE_PLAN.md) - Main release strategy
- [MOBILE_RELEASE_PLAN.md](./MOBILE_RELEASE_PLAN.md) - Mobile-specific process
- [../../CHANGELOG.md](../../CHANGELOG.md) - Version history
---
**Last Updated**: 2026-03-05
**Severity Levels**:
- 🔴 CRITICAL: Service down, data loss, security (< 1 hour)
- 🟠 HIGH: Major feature broken, workaround available (< 4 hours)
- 🟡 MEDIUM: Minor feature affected (next release OK)

View File

@@ -0,0 +1,564 @@
# Mobile App Release Plan
**For Staff Mobile & Client Mobile Apps**
---
## 📱 Overview
This document covers release procedures for:
- **Staff Mobile App** (aka "Worker Mobile") - `krow-withus-worker-mobile`
- **Client Mobile App** - `krow-withus-client-mobile`
Both apps:
- Built with Flutter
- Distributed to iOS & Android app stores
- Maintain independent versions
- Have independent CHANGELOGs
- Share backend infrastructure
---
## 🏷️ Tag & Release Naming
### Tag Format
```
krow-withus-<app>-mobile/<environment>-v<major>.<minor>.<patch>
```
### Examples
**Staff Mobile (Worker Mobile)**
```
krow-withus-worker-mobile/dev-v0.1.0
krow-withus-worker-mobile/stage-v0.2.0
krow-withus-worker-mobile/prod-v1.0.0
krow-withus-worker-mobile/prod-v1.0.1-hotfix.1
```
**Client Mobile**
```
krow-withus-client-mobile/dev-v0.1.0
krow-withus-client-mobile/stage-v0.2.0
krow-withus-client-mobile/prod-v1.0.0
```
### GitHub Release Names
```
Krow With Us - Worker Mobile - DEV - v0.1.0
Krow With Us - Worker Mobile - STAGE - v0.2.0
Krow With Us - Worker Mobile - PROD - v1.0.0
Krow With Us - Client Mobile - DEV - v0.1.0
Krow With Us - Client Mobile - STAGE - v0.2.0
Krow With Us - Client Mobile - PROD - v1.0.0
```
---
## 📝 CHANGELOG Management
### Location
Each app has its own CHANGELOG in the `apps/mobile/` directory structure:
```
apps/mobile/
├── packages/
│ ├── features/
│ │ ├── staff/
│ │ │ ├── authentication/CHANGELOG.md
│ │ │ ├── home/CHANGELOG.md
│ │ │ ├── payments/CHANGELOG.md
│ │ │ ├── shifts/CHANGELOG.md
│ │ │ └── ... (other staff features)
│ │ └── client/
│ │ ├── dashboard/CHANGELOG.md
│ │ ├── orders/CHANGELOG.md
│ │ └── ... (other client features)
│ └── ... (other packages)
├── apps/
│ ├── staff_app/CHANGELOG.md ← Staff app root
│ └── client_app/CHANGELOG.md ← Client app root
└── CHANGELOG.md ← Consolidated (optional)
```
### App-Level CHANGELOG Format
**File**: `apps/mobile/apps/staff_app/CHANGELOG.md`
```markdown
# Staff Mobile App - Change Log
## [0.2.0] - 2026-03-15
### Added
- Feature X implementation
- Feature Y enhancement
- New UI component Z
### Fixed
- Bug fix for issue #123
- Crash when loading payments
### Changed
- Updated design system
- Improved performance
### Deprecated
- Removed old API endpoint
## [0.1.0] - 2026-03-01
### Added
- Initial release
- Authentication with phone & OTP
- Shift browsing and booking
- Clock in/out functionality
- Payment history view
```
### Consolidated CHANGELOG (Optional)
**File**: `apps/mobile/CHANGELOG.md` (at root of mobile folder)
High-level overview of both apps:
```markdown
# Krow Workforce - Mobile Apps - Change Log
## Staff Mobile v0.2.0 + Client Mobile v0.1.0 - 2026-03-15
### Staff Mobile v0.2.0
- Feature improvements
- Bug fixes
### Client Mobile v0.1.0
- Initial release
## Previous versions...
```
---
## 📝 Version Files
### Staff Mobile App
**Primary Version File**: `apps/mobile/apps/staff_app/pubspec.yaml`
```yaml
name: staff_app
description: "Krow With Us - Staff App"
# Version format: MAJOR.MINOR.PATCH+BUILD_NUMBER
version: 0.1.0+1
environment:
sdk: '>=3.10.0 <4.0.0'
flutter: '>=3.38.0 <4.0.0'
```
**Rules**:
- Update version before each release
- Bump build number (+1) every build
- SemVer only for version part (before +)
### Client Mobile App
**Primary Version File**: `apps/mobile/apps/client_app/pubspec.yaml`
```yaml
name: client_app
description: "Krow With Us - Client App"
version: 0.1.0+1
environment:
sdk: '>=3.10.0 <4.0.0'
flutter: '>=3.38.0 <4.0.0'
```
---
## 🚀 Release Workflow
### Step 1: Create Release Branch
```bash
cd /Users/achintha/Documents/GitHub/krow-workforce
# For Staff Mobile
git checkout -b release/staff-mobile-v0.2.0
# For Client Mobile
git checkout -b release/client-mobile-v0.2.0
```
---
### Step 2: Update Version Numbers
#### Staff Mobile Example (v0.1.0 → v0.2.0)
**File**: `apps/mobile/apps/staff_app/pubspec.yaml`
```yaml
# Old
version: 0.1.0+5
# New
version: 0.2.0+6
```
#### Client Mobile Example (v0.1.0 → v0.2.0)
**File**: `apps/mobile/apps/client_app/pubspec.yaml`
```yaml
# Old
version: 0.1.0+3
# New
version: 0.2.0+4
```
---
### Step 3: Update CHANGELOG
**File**: `apps/mobile/apps/staff_app/CHANGELOG.md`
Add entry at **top**:
```markdown
# Staff Mobile App - Change Log
## [0.2.0] - 2026-03-05
### Added
- New shift details page with profile gating
- Benefits overview section
- Auto-match functionality
### Fixed
- Payment history display bug
- Clock-in location verification
### Changed
- Updated design system components
- Improved shift booking flow
## [0.1.0] - 2026-02-15
...
```
---
### Step 4: Commit Changes
```bash
cd /Users/achintha/Documents/GitHub/krow-workforce
# Stage changes
git add apps/mobile/apps/staff_app/pubspec.yaml
git add apps/mobile/apps/staff_app/CHANGELOG.md
# Commit
git commit -m "chore(staff-mobile): bump version to 0.2.0
- Updated pubspec.yaml version: 0.1.0 → 0.2.0
- Updated build number: 5 → 6
- Updated CHANGELOG.md with v0.2.0 changes"
```
---
### Step 5: Create Pull Request
```bash
# Push release branch
git push origin release/staff-mobile-v0.2.0
# Create PR (GitHub CLI)
gh pr create \
--title "Release: Staff Mobile v0.2.0" \
--body "## Release: Staff Mobile v0.2.0
### Changes
- See CHANGELOG.md for full list
### Testing
- [ ] All tests passing
- [ ] Manual testing complete
- [ ] CodeMagic build successful
### Checklist
- [x] Version updated
- [x] CHANGELOG updated
- [x] Branch created from main
- [ ] Approved by team lead"
```
---
### Step 6: Merge to Main
Once PR is approved:
```bash
# Switch to main
git checkout main
git pull origin main
# Merge (fast-forward only)
git merge --ff-only release/staff-mobile-v0.2.0
# Push to remote
git push origin main
# Delete release branch
git push origin --delete release/staff-mobile-v0.2.0
```
---
### Step 7: Create Git Tag
```bash
# For DEV release
git tag -a krow-withus-worker-mobile/dev-v0.2.0 \
-m "Staff Mobile v0.2.0 - Dev Release
Features:
- Shift details improvements
- Benefits overview
- Auto-match functionality
Testing:
- All unit tests passing
- Manual QA on dev environment"
# For STAGE release
git tag -a krow-withus-worker-mobile/stage-v0.2.0 \
-m "Staff Mobile v0.2.0 - Stage Release"
# For PROD release
git tag -a krow-withus-worker-mobile/prod-v0.2.0 \
-m "Staff Mobile v0.2.0 - Production Release"
```
**Push tags**:
```bash
git push origin krow-withus-worker-mobile/dev-v0.2.0
git push origin krow-withus-worker-mobile/stage-v0.2.0
git push origin krow-withus-worker-mobile/prod-v0.2.0
```
---
### Step 8: Create GitHub Release
1. Go to: GitHub → Releases → Draft a new release
2. Fill in:
```
Tag version: krow-withus-worker-mobile/dev-v0.2.0
Release title:
Krow With Us - Worker Mobile - DEV - v0.2.0
Description:
## 🎯 What's New in v0.2.0
### ✨ Features
- Shift details page with profile completion gating
- Benefits overview with sick leave tracking
- Auto-match shift recommendations
### 🔧 Improvements
- Faster payment history loading
- Better shift booking UX
- Improved clock-in reliability
### 🐛 Bug Fixes
- Fixed payment display date issue
- Fixed location verification on iOS 15+
- Fixed crash when no shifts available
## 📦 Installation
**iOS**: Download via TestFlight (internal) or App Store
**Android**: Download via Play Store
## 🔗 Dependencies
Requires:
- Backend API v0.1.0+
- DataConnect schema v0.3.0+
## ⚠️ Known Issues
- Location permissions take 5-10 seconds on first install
- Workaround: Grant permissions in Settings app
## 📝 Notes for QA
- Test on actual device, not emulator
- Verify clock-in with GPS enabled
- Test all payment history edge cases
---
Release Date: 2026-03-05
Build Number: 6
```
3. **Optional**: Attach build artifacts (APK/AAB from CodeMagic)
4. **Click**: "Publish release"
---
## 🔄 Deployment Flow
### Dev Release → Staging
After dev is tested:
```bash
# Create stage tag from same commit
git tag -a krow-withus-worker-mobile/stage-v0.2.0 \
krow-withus-worker-mobile/dev-v0.2.0 \
-m "Staff Mobile v0.2.0 - Stage Release"
git push origin krow-withus-worker-mobile/stage-v0.2.0
# Deploy using CodeMagic or manual process
```
### Staging Release → Production
After QA approval:
```bash
# Create prod tag from same commit
git tag -a krow-withus-worker-mobile/prod-v0.2.0 \
krow-withus-worker-mobile/stage-v0.2.0 \
-m "Worker Mobile v0.2.0 - Production Release"
git push origin krow-withus-worker-mobile/prod-v0.2.0
# Deploy to production
```
---
## 📱 App Store Distribution
### iOS App Store
**Version Name**: Match pubspec.yaml version (0.2.0)
**Build Number**: Match pubspec.yaml build number (+6)
**Steps**:
1. Ensure TestFlight build passed
2. Submit to App Review
3. Apple reviews (3-5 days)
4. Release to users (can be phased)
### Google Play Store
**Version Name**: Match pubspec.yaml version (0.2.0)
**Version Code**: Match pubspec.yaml build number (6)
**Steps**:
1. Upload APK/AAB from CodeMagic
2. Fill in release notes (from CHANGELOG)
3. Submit for review
4. Google reviews (hours to 24h)
5. Release to users (can be phased, e.g., 10% then 100%)
---
## 🔧 Pre-Release Checklist
Before creating tags:
- [ ] All PRs merged to main
- [ ] Code review complete
- [ ] Tests passing (unit, widget, integration)
- [ ] No lint/analysis errors: `flutter analyze`
- [ ] Pubspec.yaml version updated
- [ ] Build number incremented
- [ ] CHANGELOG.md updated with date
- [ ] Screenshots prepared (fresh)
- [ ] Release notes drafted
- [ ] No hardcoded strings (use translations)
- [ ] No debug prints remaining
- [ ] Performance acceptable (app launch < 3 seconds)
- [ ] Screen lock/unlock works
- [ ] Deep links tested
- [ ] Notifications working
- [ ] GPS/location working
- [ ] Camera permissions working
- [ ] All user-facing text reviewed
---
## 🎯 Release Cadence
### Development Releases (dev)
- **Frequency**: Weekly
- **Day**: Monday 10:00 UTC
- **Process**: Quick, test in dev only
### Staging Releases (stage)
- **Frequency**: Bi-weekly (on sprint/feature completion)
- **Day**: Wednesday before production
- **Process**: Full QA testing, 1 week in staging
### Production Releases (prod)
- **Frequency**: Monthly (end of sprint)
- **Day**: Sunday/Monday morning (low traffic)
- **Process**: Full validation, market distribution
---
## 🔗 Related
- [OVERALL_RELEASE_PLAN.md](./OVERALL_RELEASE_PLAN.md) - General strategy
- [HOTFIX_PROCESS.md](./HOTFIX_PROCESS.md) - Emergency procedures
- [../../CHANGELOG.md](../../CHANGELOG.md) - Root-level history
---
## 📞 Common Questions
**Q: What if I need to release just one app (not both)?**
A: Completely fine! Each app is independent. Release when ready.
**Q: Do I need to update the root CHANGELOG?**
A: Optional. If you do, keep it high-level and reference app-specific CHANGELOGs.
**Q: What about shared packages inside mobile/?**
A: If shared package updated, mention in both app CHANGELOGs.
**Q: How do I handle breaking changes?**
A: MAJOR version bump (0.x → 1.x) and clearly document in CHANGELOG.
**Q: Can I release dev and stage on different days?**
A: Yes, no fixed schedule for dev/stage. Prod should be consistent (Sundays).
---
**Last Updated**: 2026-03-05
**Owner**: Mobile Engineering Team
**Status**: Active

View File

@@ -0,0 +1,452 @@
# KROW Workforce - Overall Release Plan
**Document Version**: 1.0
**Created**: 2026-03-05
**Last Updated**: 2026-03-05
**Product Scope**: All products (Mobile, Web, Backend, Database)
---
## 📋 Overview
This document outlines the release strategy for KROW Workforce monorepo containing 5 products:
1. **Staff Mobile App** (Flutter - iOS/Android)
2. **Client Mobile App** (Flutter - iOS/Android)
3. **Web Dashboard** (React/Vite)
4. **Backend Services** (Node.js - Command API, Core API)
5. **Database** (Firebase Data Connect with PostgreSQL)
---
## 🔗 Versioning Strategy
### Semantic Versioning (SemVer)
All products use **Semantic Versioning 2.0.0**:
```
MAJOR.MINOR.PATCH-QUALIFIER
0.1.0
1.2.3-rc.1
```
- **MAJOR** (0→1): Breaking changes, major features
- **MINOR** (1→2): Backward-compatible new features
- **PATCH** (3→4): Bug fixes, minor improvements
- **QUALIFIER** (optional): `-rc.1`, `-beta.1`, `-hotfix.1`
### Version Independence
Each product maintains **independent versioning**:
- Products release on their own schedule
- No requirement to synchronize versions
- Can release major updates independently
---
## 🏷️ Git Tag Naming Convention
### Standard Format
```
<product>/<environment>-v<major>.<minor>.<patch>
```
### Products & Environments
| Product | Tag Prefix | Environments |
|---------|-----------|---------------|
| Staff Mobile | `krow-withus-worker-mobile` | dev, stage, prod |
| Client Mobile | `krow-withus-client-mobile` | dev, stage, prod |
| Web Dashboard | `web-dashboard` | dev, stage, prod |
| Command API | `command-api` | dev, stage, prod |
| Core API | `core-api` | dev, stage, prod |
| DataConnect | `dataconnect` | stage, prod |
### Environments
- **dev**: Development releases (daily/weekly), unstable
- **stage**: Staging releases (bi-weekly), pre-production testing
- **prod**: Production releases (monthly), stable, customer-facing
### Examples
```
krow-withus-worker-mobile/dev-v0.1.0
krow-withus-client-mobile/stage-v0.2.0
web-dashboard/prod-v1.0.0
command-api/dev-v0.2.1
core-api/prod-v0.1.0
```
---
## 📅 Release Cadence
### Development Releases (dev)
- **Frequency**: Weekly or as-needed
- **Scope**: Feature completions, bug fixes
- **Duration**: Not guaranteed stable
- **Deployment**: Dev environment only
- **Who**: Development team
### Staging Releases (stage)
- **Frequency**: Bi-weekly (typically mid/end of sprint)
- **Scope**: Sprint completion, feature milestones
- **Duration**: 1-2 weeks stability expected
- **Deployment**: Staging environment for QA
- **Who**: QA team validates
### Production Releases (prod)
- **Frequency**: Monthly or sprint-based
- **Scope**: Feature milestone completion, critical fixes
- **Duration**: 4+ weeks standard support
- **Deployment**: Production environment (customer-facing)
- **Who**: Product owner approves, DevOps deploys
---
## 🔄 Product Dependency & Deployment Order
### Critical Path (for synchronized releases)
Deploy in this order:
1. **DataConnect Schema** (if schema changed)
- Deploy schema changes first
- All APIs depend on schema availability
2. **Backend Services** (parallel OK)
- Command API
- Core API
- Both can deploy simultaneously
3. **Web Dashboard**
- Can deploy once backend ready
- Test API endpoints stable
4. **Mobile Apps** (parallel OK)
- Staff Mobile
- Client Mobile
- Both can deploy simultaneously, independent of web
### Independent Releases
Products **can release independently** if:
- No backend schema changes
- No breaking API changes
- No data migrations required
Example: Staff Mobile can release UI improvements without web/backend changes.
---
## 📝 CHANGELOG Management
### Location & Structure
Each major product maintains its own CHANGELOG:
```
apps/mobile/packages/features/staff/*/CHANGELOG.md
apps/mobile/packages/features/client/*/CHANGELOG.md
apps/web/CHANGELOG.md
backend/command-api/CHANGELOG.md
backend/core-api/CHANGELOG.md
CHANGELOG.md (root - high-level overview)
```
### Format
```markdown
| Date | Version | Change |
|------|---------|--------|
| 2026-03-05 | 0.1.0 | Initial release - [feature list] |
```
### What to Track
- Features added
- Bugs fixed
- Breaking changes (clearly marked ⚠️)
- Dependencies upgraded
- Migration steps (if applicable)
---
## ✅ Release Checklist
### Pre-Release (48 hours before)
- [ ] All PRs merged to main
- [ ] Code review complete
- [ ] All tests passing (unit, integration, E2E)
- [ ] No lint/type errors
- [ ] Mobile builds succeed (CodeMagic)
- [ ] Performance benchmarks acceptable
- [ ] Security scan completed
- [ ] CHANGELOG.md updated with all changes
- [ ] Documentation updated
- [ ] Team notified of pending release
### Release Day
- [ ] Update version numbers in all relevant files
- [ ] Update CHANGELOG with date
- [ ] Git commit: `git commit -m "chore: bump version to X.Y.Z"`
- [ ] Git push changes to main
- [ ] Create git tag: `git tag -a <product>/<env>-v<version> -m "Release message"`
- [ ] Push tags: `git push origin <tag-name>`
- [ ] Deploy to target environment
- [ ] Smoke tests pass
- [ ] Create GitHub Release page
- [ ] Notify stakeholders
### Post-Release (24 hours)
- [ ] Monitor error logs
- [ ] Verify all features work end-to-end
- [ ] Performance is acceptable
- [ ] No regressions reported
- [ ] Users updated if needed
- [ ] Document any issues
---
## 🔐 Protected Tags
### Branch Protection Rules
**Production tags require approval:**
- Tag pattern: `*/prod-v*`
- Require pull request review (1+ approval)
- Require status checks to pass
- Prevent force pushes
- Disable deletions
**Staging tags recommended:**
- Tag pattern: `*/stage-v*`
- Consider: Require at least 1 approval
- Status checks should pass
**Dev tags open:**
- Tag pattern: `*/dev-v*`
- No restrictions
- Allow fast iteration
---
## 🚨 Rollback Procedures
### For Production Issues
**If critical issue detected:**
1. **Identify** the product and issue
2. **Assess** impact and severity
3. **Decide** rollback vs hotfix
- Rollback: Undo entire release
- Hotfix: Fix and re-release (see HOTFIX_PROCESS.md)
4. **Execute** rollback:
```bash
# Revert commit
git revert <commit-hash> -m 1
git push origin main
# Or switch traffic back to previous version
# (depends on deployment infrastructure)
```
5. **Communicate** with users
6. **Plan** hotfix or next release
### Time Windows
- **Awareness**: 15-30 minutes (monitoring)
- **Decision**: 15-30 minutes (severity assessment)
- **Execution**: 15-60 minutes (rollback deployment)
- **Verification**: 30-60 minutes (smoke tests)
- **Communication**: Immediate + 24h updates
**Total**: 2-4 hours from detection to stable state
---
## 📊 Release Templates & Tools
### Git Commands
```bash
# Create tag
git tag -a krow-withus-worker-mobile/dev-v0.1.0 \
-m "Staff Mobile v0.1.0 - Feature X"
# Push tag
git push origin krow-withus-worker-mobile/dev-v0.1.0
# View tags for product
git tag -l "krow-withus-worker-mobile/*" --sort=-version:refname
# See what's in a tag
git show krow-withus-worker-mobile/dev-v0.1.0
# Delete tag (if mistake)
git tag -d krow-withus-worker-mobile/dev-v0.1.0
git push origin --delete krow-withus-worker-mobile/dev-v0.1.0
```
### GitHub Release Template
```markdown
# Krow With Us - Worker Mobile - DEV - v0.1.0
**Release Date**: [Date]
**Environment**: Development
## What's New
### ✨ Features
- Feature 1 description
- Feature 2 description
### 🔧 Improvements
- Improvement 1
- Improvement 2
### 🐛 Bug Fixes
- Bug fix 1
- Bug fix 2
## Dependencies
Requires:
- Backend API v0.1.0 or higher
- DataConnect schema v0.3.0 (if updated)
## Installation
[Download links & instructions]
## Known Issues
- Issue 1: [desc] (Workaround: ...)
## Support
contact: support@krow-workforce.com
```
---
## 🔄 Hotfix Releases
See [HOTFIX_PROCESS.md](./HOTFIX_PROCESS.md) for emergency procedures.
Quick summary:
1. Branch from production tag
2. Fix the issue
3. Bump PATCH version only
4. Test and deploy immediately
5. Create hotfix tag
---
## 📱 Mobile-Specific Release Process
See [MOBILE_RELEASE_PLAN.md](./MOBILE_RELEASE_PLAN.md) for detailed mobile app process including:
- Staff Mobile vs Client Mobile differences
- Build number management
- CodeMagic integration
- App store distribution
- CHANGELOG per app
---
## 🎯 Release Coordination
### Single Product Release
1. Update version files
2. Update CHANGELOG
3. Commit & push
4. Create tag
5. Deploy
6. Create GitHub Release
**Time**: 30-45 minutes (excluding testing)
### Multi-Product Release (e.g., v1.0.0)
**Pre-release phase** (1 week before):
- Code freeze announced
- QA testing begins
- No new features merged
**Release phase** (2-3 days):
- Staging release (all products)
- QA validation
- Product owner sign-off
**Production phase** (1 day):
- Deploy in dependency order
- Smoke tests each product
- Monitor 24 hours
- User communication
**Time**: 5-7 days total, 4 hours active deployment
---
## 📞 Roles & Responsibilities
| Role | Responsibility |
|------|-----------------|
| **Developer** | Keep code release-ready, update versions |
| **QA** | Test staging releases, validate prod |
| **Release Engineer** | Create tags, manage deployment, monitor |
| **Product Owner** | Approve releases, communicate timeline |
| **DevOps** | Infrastructure ready, deployment scripts |
---
## 📊 Success Metrics
Track these per release:
- **Lead Time**: Time from code commit to production
- **Deployment Frequency**: How often you release
- **Change Failure Rate**: % of releases needing rollback
- **Time to Recovery**: Time to fix production issues
- **User Adoption**: % of users on latest version
---
## 📚 Related Documentation
- [MOBILE_RELEASE_PLAN.md](./MOBILE_RELEASE_PLAN.md) - Mobile app releases
- [HOTFIX_PROCESS.md](./HOTFIX_PROCESS.md) - Emergency procedures
- [../../RELEASE_STRATEGY.md](../../RELEASE_STRATEGY.md) - Original detailed guide
- [../../CHANGELOG.md](../../CHANGELOG.md) - Root version history
---
## ✅ Implementation Status
- ✅ Versioning strategy: SemVer
- ✅ Environments: dev, stage, prod
- ✅ Tag naming: Product-specific with brand prefix
- ✅ Product dependencies: Defined
- ✅ Release cadence: 3 levels
- ⏳ GitHub Actions: To be set up
- ⏳ Deployment automation: To be set up
---
**Next Step**: Review [MOBILE_RELEASE_PLAN.md](./MOBILE_RELEASE_PLAN.md) for app-specific process.