99.9%
SLA Compliance
42%
Distance Saved
37%
Fewer Vehicles
<45ms
Dispatch Latency
MileTruth Impact Analysis
Performance

The Impact of
Optimisation

Side-by-side results from our Hyderabad hub case study — demonstrating how MileTruth turns logistics chaos into clarity while maintaining 100% fulfillment across every delivery zone.

  • 42% reduction in total distance travelled
  • 37% fewer vehicles required for the same volume
  • Significant reduction in fuel and battery consumption
  • Predictable, on-time delivery across all city zones
  • 100% fulfillment maintained throughout the test period
Innovation

Our Competitive
Edge

The Parallel Universe Engine — simulating 6 route strategies simultaneously to benchmark and select the absolute winner for every delivery window, every time.

  • Solves the EV Paradox with intelligent battery simulation
  • Mathematical precision powered by Google OR-Tools
  • SLA-first reliability with real-time ETA validation
  • 6 parallel strategy universes evaluated per dispatch
  • Sub-45ms inference latency from ingestion to output
MileTruth Competitive Edge
MileTruth Fulfillment Strategy
Strategy

Happier Riders.
Higher Fulfillment.

Our grading engine compares legacy heuristics against unified optimisation, ensuring battery feasibility and SLA compliance on every single route before a rider ever leaves the hub.

  • Dynamic grading scores fulfillment, SLA compliance, and route efficiency
  • Every EV route pre-validated against real charge capacity before dispatch
  • Actionable fleet insights for managers and operations teams
  • Optimised workload distribution reduces rider fatigue and improves retention